Plain-language definitions of the money words on a construction job — retainage, committed cost, progress billing, markup, margin — each with a worked number.

Each term has its own page with a worked number and where the figure lives in Obra. The product's own vocabulary is in the Help Center glossary.

1

1099 subcontractor also independent contractor, 1099 worker, sub
An independent business you pay for work on your jobs, reported to the IRS on Form 1099-NEC once payments reach $600 a year, not an employee on payroll.

A

Allowance also selection allowance, material allowance
A placeholder amount in a contract for an item the client hasn't chosen yet. If the selection costs more, the overage is billed; if less, a credit is due.

B

Backcharge also back charge, chargeback, deductive charge
A cost a general contractor deducts from what it owes a sub for work the sub failed to do or damage the sub caused: cleanup, repairs, another trade's rework.
Budget vs. actual also budget variance, cost variance report, estimate vs. actual
The per-cost-code comparison of what a job should cost, what it has cost and what's committed. The report that shows drift while the job can still be steered.

C

Certificate of insurance also COI, insurance certificate, ACORD 25
A one-page insurer's summary proving a contractor or sub carries the coverage a contract requires, with limits and dates. Collected before work and payment.
Change order also CO, variation, extra
A written, signed amendment to a construction contract that adds, removes or alters scope and sets the new price and dates. The only way a fixed price moves.
Committed cost also commitment, open commitment
A cost you've agreed to pay but haven't been invoiced for: a signed subcontract, a placed order, an accepted quote. It belongs in the forecast from that day.
Contingency also contingency reserve, contingency allowance
Money set aside in a budget for expected costs that can't be named yet: the wall that isn't in the drawings. Usually 5% to 15% of direct cost on renovations.
Contract value also contract sum, contract price, original contract
The price the client agreed to pay for the original scope. It never changes retroactively; approved change orders stack on it as the adjusted contract value.
Cost code also cost category, cost division, CSI code
A short label from a fixed list (demolition, framing, electrical, permits, labor) tagged on every job cost, so budgets, actuals and estimates line up.
Cost to complete also estimate to complete, ETC
What a job still has to spend to finish: open commitments plus the labor and material not yet bought. Recorded cost plus cost to complete is the forecast.
Cost-plus contract also cost plus, cost-plus-fee, open book
A contract where the client pays the contractor's documented costs plus an agreed fee, a percentage of cost or a fixed amount, instead of one fixed price.

D

Deposit also down payment, initial payment, mobilization payment
What a client pays at signing, before work starts, to fund materials and hold the spot. Some states cap it on residential work; California at 10% or $1,000.
Direct cost also job cost, cost of sales, hard cost
A cost that exists only because a job exists: materials, crew labor on site, subs, permits, rentals and deliveries. The costs job costing assigns to a project.
Draw schedule also payment schedule, draws
The agreed list of payments on a contract, each tied to a milestone or date, stating what share of the price is due when. Progress billing's residential form.

E

Estimate at completion also EAC, expected final cost, forecast final cost
The total a job is expected to cost when it's done: what's been recorded so far plus the cost to complete. Against the contract, that's the expected margin.

F

Final payment also final draw, completion payment, balance due
The last draw on a contract, due when the work is complete and accepted, usually with retainage released. Most often delayed, and the one lien rights protect.
Fixed-price contract also lump sum, stipulated sum
A contract for a set scope at a set price. The contractor keeps any savings and absorbs any overrun; scope changes are priced separately as change orders.

G

General conditions also general requirements, site overhead, job overhead
The job-specific costs of running a site that belong to no trade: supervision, dumpsters, portable toilets, temporary power, cleanup, permits, site protection.
Gross margin also gross profit margin, gross profit
Revenue minus the job's direct costs (labor, materials, subs, permits), as a percentage of revenue. The number a bid is measured by, before overhead is paid.
Guaranteed maximum price also GMP, cost-plus with a cap
A cost-plus contract with a ceiling: the client pays documented cost plus fee up to an agreed cap; the contractor absorbs the rest. Savings are often shared.

I

Indirect cost also indirect job cost, burden, shared cost
A cost that supports the work without belonging to one job: yard rent, trucks, tools, insurance, shared supervision. Recovered through the overhead rate.

J

Job costing also job cost accounting, project costing
Keeping each job's money separate: what it was sold for, every cost it incurred, what's been collected and the margin left, so you know which jobs made money.

L

Labor burden also burdened labor rate, fully loaded labor cost
Everything a worker costs beyond the wage: payroll taxes, workers' comp, insurance, paid time off, unbillable hours. Wage plus burden is the true hourly cost.
Lien waiver also lien release, waiver of lien
A signed document in which a contractor, sub or supplier gives up the right to file a lien on the property for work or materials covered by a specific payment.

M

Markup also markup percentage, markup on cost
The percentage added on top of a job's direct cost to reach the price. Measured against cost, so a 25% markup is a 20% margin; the two are not interchangeable.
Mechanic's lien also construction lien, contractor's lien
A legal claim on a property by a contractor, sub or supplier who improved it and wasn't paid. It clouds the title until the debt is paid or the lien released.

N

Net margin also net profit margin, net income before tax
What's left of revenue after direct job costs and overhead are paid, as a percentage of revenue. The business's result, not the job's; averages sit near 6%.

O

Overbilling and underbilling also billings in excess of costs, costs in excess of billings
Overbilling is invoicing more than the work completed has earned; underbilling is invoicing less. Both are found by comparing billed to earned on a WIP report.
Overhead also indirect costs, general and administrative, G&A
The costs of running the business that no single job causes: rent, trucks, insurance, office, the owner's salary. As a rate, what every bid must recover.

P

Pay application also pay app, application for payment, AIA G702/G703, payment application
A formal progress-payment request: work completed per schedule-of-values line, prior payments, retainage and the amount due. AIA G702 and G703 are the forms.
Progress billing also progress payments, milestone billing, draws
Invoicing a job in stages as work is completed, by milestone or by percentage of each schedule-of-values line, instead of a single invoice at the end.
Punch list also snag list, deficiency list, closeout list
The small items left to fix or finish once a job is substantially complete: touch-ups, adjustments, missing hardware. Closing it unlocks final payment.
Purchase order also PO
A written order to a supplier or sub for specific goods or work at a stated price. Once accepted, it's a committed cost on the job, invoice or no invoice.

R

Retainage also retention, holdback
The share of each progress payment, usually 5% to 10%, that a client or general contractor holds back until the work is complete and accepted.

S

Schedule of values also SOV
A line-by-line breakdown of a contract price into the parts of the work, each with its own value, used to bill progress as a percentage of each line completed.
Substantial completion also substantially complete, beneficial occupancy
When the work is finished enough for the client to use the space as intended, punch list aside. It starts the clocks on final payment and warranties.

T

Time and materials also T&M, hourly plus materials
Billing labor by the hour at agreed rates plus materials at cost or cost plus markup, with no fixed total. Used when the scope can't be defined up front.

U

Unit price also unit rate, unit cost, per-unit pricing
A price per unit of measured work, such as per square foot of tile, per linear foot of fence or per cubic yard of concrete, billed on the quantity installed.

W

Work-in-progress report also WIP schedule, WIP report, work in progress
A schedule of every open job with contract, estimated cost, cost to date, percent complete, earned revenue and billings, revealing over- and underbilling.